What We Do
LNG receiving facility is a plant to unload LNG from large-scale LNG tankers berthed at the pier. As this complicate plant adopts “unit construction method,” in which LNG receiving piping or boil-off gas (BOG) piping is shop fabricated and incorporated into the iron frame before delivery, it receives and installs the incorporated unit on site easily and smoothly. The LNG receiving facility makes remarkable contributions to shorter construction time and cost reduction.